Tuesday 20th December: Initial planning. Group meeting, where we
finalised decisions about costumes and props, and bought/collected any
that we would need over the next few weeks. We also filmed a few cutaway
shots, but without our artist there was little we could do, and did not
want to shoot too much that would then not be usable.-
Friday 30th December: Location research, discussion followed by a scouting adventure. See post for pictures.
Friday 6th January: Filmed the 'sex scene'. Experimented with lighting.
Did some photos for artist image. Followed up by shooting the scene
outside of the clinic, but due to tiredness/boredom/fatigue, the
material we had wasn't as good as we hoped.
Saturday 7th January: Went to London with the camera and cast hoping to
capture some of the atmosphere of more claustrophobic city areas (like
Brick Lane and South Bank) to contrast the comparatively bland suburban
scenes we planned to shoot. However, lack of light became a big issue
which ultimately ended our excursion.
Friday 13th January: Due to unavailability of cast members, we were
unable to continue shooting, instead deciding to review the material we
had already shot to determine any pickup shots we would need to do and
the quality and quantity of what we had already shot.
Tuesday 17th January: Re-shot the clinic scene, much better this time.
Began shooting the main performance bed of the video, but unfortunately
low camera battery cut our day short.
Friday 20th/Saturday 21st: Weather dictated that we couldn't continue
filming the performance bed this weekend, so instead we worked on
putting the blog together.
Tuesday 24th January: Began uploading the footage we had, and over viewed
it to ascertain how our shooting techniques can be improved upon for
the next chunk of performance bed filming.
Tuesday
31st January: Shot all the footage required for the party scene, using
the school Drama Studio where we had full access to extraordinarily
manipulable lighting equipment. We used readily available friends as
extras, which took some time to organise (and we weren't able to get
quite as large an enthusiastic group as we hoped) but after weeks of
waiting for the Studio to become available, we took the best chance we
could, and adapted our filming techniques to fill the frame as often as
possible.
Thursday 2nd
February: Uploaded the footage from the party/club scene. Despite first
thoughts after re watching the footage on the small camera screen
immediately after shooting, upon full review we found the footage to be
entirely suitable and that there would be no need for a re-shoot (with
much relief, after how long it had taken to book the studio and organise
a reliable 'cast').
Saturday 4th February: Begun the long process of filming the performance section for the music video in Roehampton.
UPDATE: Friday 24th February: Half term holidays, unavailable equipment
and unreliable cast members are all attempting to draw the process out,
but nevertheless we have been working on completing filming and slowly
piecing together short individual sequences on the music video. Only one
more section needs to be filmed, as well as one short pickup shoot.
UPDATE: Friday 23rd March: Filming was completed earlier this month, and
now the editing process is finally drawing to a close. Meanwhile, we
have been working on the ancillary products of album artwork with
photoshop, and of course keeping blogs updated.
Tuesday 27th March: Music video and ancillary tasks have been completed!