Wednesday 4 January 2012

Video Diary [Day by Day]

Tuesday 20th December: Initial planning. Group meeting, where we finalised decisions about costumes and props, and bought/collected any that we would need over the next few weeks. We also filmed a few cutaway shots, but without our artist there was little we could do, and did not want to shoot too much that would then not be usable.-

Friday 30th December: Location research, discussion followed by a scouting adventure. See post for pictures.

Friday 6th January: Filmed the 'sex scene'. Experimented with lighting. Did some photos for artist image. Followed up by shooting the scene outside of the clinic, but due to tiredness/boredom/fatigue, the material we had wasn't as good as we hoped.


Saturday 7th January: Went to London with the camera and cast hoping to capture some of the atmosphere of more claustrophobic city areas (like Brick Lane and South Bank) to contrast the comparatively bland suburban scenes we planned to shoot. However, lack of light became a big issue which ultimately ended our excursion.


Friday 13th January: Due to unavailability of cast members, we were unable to continue shooting, instead deciding to review the material we had already shot to determine any pickup shots we would need to do and the quality and quantity of what we had already shot.

Tuesday 17th January: Re-shot the clinic scene, much better this time. Began shooting the main performance bed of the video, but unfortunately low camera battery cut our day short.

Friday 20th/Saturday 21st: Weather dictated that we couldn't continue filming the performance bed this weekend, so instead we worked on putting the blog together.

Tuesday 24th January: Began uploading the footage we had, and over viewed it to ascertain how our shooting techniques can be improved upon for the next chunk of performance bed filming.

Tuesday 31st January: Shot all the footage required for the party scene, using the school Drama Studio where we had full access to extraordinarily manipulable lighting equipment. We used readily available friends as extras, which took some time to organise (and we weren't able to get quite as large an enthusiastic group as we hoped) but after weeks of waiting for the Studio to become available, we took the best chance we could, and adapted our filming techniques to fill the frame as often as possible.


Thursday 2nd February:  Uploaded the footage from the party/club scene. Despite first thoughts after re watching the footage on the small camera screen immediately after shooting, upon full review we found the footage to be entirely suitable and that there would be no need for a re-shoot (with much relief, after how long it had taken to book the studio and organise a reliable 'cast').

Saturday 4th February: Begun the long process of filming the performance section for the music video in Roehampton.



UPDATE: Friday 24th February: Half term holidays, unavailable equipment and unreliable cast members are all attempting to draw the process out, but nevertheless we have been working on completing filming and slowly piecing together short individual sequences on the music video. Only one more section needs to be filmed, as well as one short pickup shoot.

UPDATE: Friday 23rd March: Filming was completed earlier this month, and now the editing process is finally drawing to a close. Meanwhile, we have been working on the ancillary products of album artwork with photoshop, and of course keeping blogs updated.

Tuesday 27th March
: Music video and ancillary tasks have been completed!

No comments:

Post a Comment